The patient is on the operating table.
I welded most of the drilled holes in the frame, added missing frame tubing, welded some cracks.
Fixed a broken foot peg bracket, and fitted a later model for better grip.
The swingarm shaft and bushings were totally worn out and poorly repaired. I discarded the shaft, cut away the brackets and pressed out the old bushings.
Old bushing
Time to start up the old lathe.
New shaft and bushings fabricated.
I made the new bushing longer to ensure there would be a larger area for the new shaft to rest on.
The new bushings pressed into the frame.
Fixing of the new brackets.
Swingarm absolutely free of play, nice.
Not so nice...
Time to turn up the heat.